200 Sets of Emergency Shower Rooms Supplied for UMC 12i P3 Process Pipeline Project in Singapore
Project Overview
As a leading semiconductor manufacturing facility, UMC requires strict safety measures throughout its process pipeline systems to protect personnel working in environments involving chemical and industrial hazards.
For the UMC 12i P3 process pipeline project in Singapore, DAO was selected to provide a large-scale emergency shower room solution, delivering 200 sets of emergency shower rooms to support workplace safety and emergency response requirements.
The project required reliable equipment with consistent quality, efficient production capability, and professional technical support to meet the demands of a large-scale industrial installation.
Project Highlights
1. Large-Scale Production Capability
To fulfill the requirement of 200 sets within the project schedule, DAO implemented a structured production process with strict quality control at every stage, including material inspection, assembly, functional testing, and final inspection.
Our manufacturing capability ensured stable product quality and reliable delivery for this large-volume EPC project.
2. Customized Safety Solution
DAO designed and manufactured emergency shower rooms according to the project requirements, providing a complete solution integrating:
- Emergency shower system
- Eyewash facilities
- Protective enclosure structure
- Drainage and water collection design
- Safety identification and accessories
The enclosed design helps contain contaminated water during emergency use while providing additional protection and privacy for users.
3. Reliable Performance for Industrial Applications
The emergency shower rooms feature corrosion-resistant materials, waterproof construction, and anti-slip design to ensure safe operation in demanding industrial environments.
Each unit was manufactured and inspected according to DAO’s strict quality management procedures to ensure long-term reliability.
4. Professional Project Support
Beyond product supply, DAO provided technical communication, production coordination, and project support throughout the manufacturing process to ensure smooth project execution.
Project Significance
The successful delivery of 200 emergency shower rooms for the UMC 12i P3 process pipeline project demonstrates DAO’s capability in supporting large-scale industrial safety projects.
With extensive experience in emergency shower and eyewash systems, DAO continues to provide reliable safety solutions for semiconductor, chemical, energy, and other high-risk industries worldwide.